  • Engineering project plan
    • Conceptual
      • Planning and Control
        • Business plan identifying project opportunity
        • Define project objective and information needs
        • Identify industry standards for project objectives
        • Develop preliminary conceptual schedule and staffing
        • Initial planning complete
        • Develop appropriation strategy
        • Develop management model and staff plan
      • Site Assessment
        • Identify potential sites
        • Define infrastructure requirements
        • Define utility needs
        • Identify project site
        • Assess regulatory and environmental impacts
        • Identify permitting requirements
        • Recommend site
        • Site and planning review
      • Scope Definition
        • Develop general scope for project objectives
        • Evaluate project needs, develop major study list
        • Start major studies
        • Complete major studies and make recommendations
        • Develop specific scope
        • Prepare final conceptual schedule
        • Provide written scope information
      • Discipline Support
        • Create deliverables list
        • Start flow sheets and design criteria
        • Start discipline-specific drawings and equipment list
        • Start conceptual layout
        • Complete flow sheets and design criteria
        • Complete discipline-specific drawings and equipment list
        • Complete conceptual layout
      • Conceptual Phase Completion
        • Prepare conceptual scope and estimate for review
        • Evaluate business plan - rework as needed
        • Conceptual phase complete
    • Definition
      • Planning and Control
        • Review conceptual plan
        • Update project staffing plan
        • Develop project contingency and indirect cost factors
        • Identify definition phase engineering deliverables
      • Scope Definition
        • Review studies list
        • Provide design requirements
        • Establish vendor data requirements/equipment budgets
        • Define equipment specifications and list
        • Generate piping and instrument drawing (PID)
      • Discipline Support
        • Review regulatory agency requirements
        • Generate general arrangement and site plans
        • Develop discipline specific control drawings, lists, specifications
        • Evaluate input on feasibility of construction input
      • Definition Phase Completion
        • Generate scope document (including infrastructure)
        • Generate project capital estimate
        • Establish project schedule
        • Review definition, scope and estimate
        • Scope complete/issue cost estimate
        • Appropriate project monies
        • Project authorized
    • Design
      • Planning and Control
        • Review definition, scope and estimate
        • Develop or update project procedures
        • Finalize design and construction schedule
        • Develop and manage issues list
        • Procure long delivery equipment
        • Establish and implement procurement and contracting plan
        • Plan and staff design phase
        • Define engineering presentation and content for specifications and drawings
        • Implement document control
        • Establish project monitoring
        • Develop project cost control and earned value system
        • Finalize deliverables list
        • Implement project reporting
        • Invoice approval/contract payments
        • Procure equipment
        • Implement expediting including vendor drawings
        • Training start-up plan
      • Scope Refinement
        • Update project design criteria
        • Issue for design: equipment list
        • Issue for discipline design: piping and instrument drawings (PIDs)
        • Issue for discipline design: general arrangement drawings (GAs)/site plan
        • Equipment specification, bid, vendor selection
        • Process equipment functional descriptions
      • Discipline Support
        • Establish discipline governing code requirements
        • Review and finalize discipline standards and specifications
        • Start Discipline Design
          • Start architectural design
          • Start civil design
          • Start mechanical design
          • Start piping design
          • Start structural design
          • Start electrical design
          • Start instrumentation design
        • Implement first quality review
        • Vendor drawing review (all disciplines)
        • Vendor drawing certification (all disciplines)
        • Cross discipline engineering review
        • Complete equipment list
        • Complete PIDs
        • Complete GAs/site plan
        • Complete Discipline Design
          • Complete architectural design
          • Complete civil design
          • Complete mechanical design
          • Complete structural design
          • Complete piping design
          • Complete electrical design
          • Complete instrumentation design
        • Implement second quality review
        • Implement code compliance and safety reviews
        • Design Phase Completion
          • Check and redraft drawings and lists (all disciplines)
          • Produce permit drawings and code compliance calculations (all disciplines)
          • Issue engineering for permitting, bidding and construction
          • Contractor selection/contract review
          • Project complete - close out report, issue drawings of record
    • Construction
      • Select construction contractor
      • Mobilize on site
      • Construction
      • Construction complete