  • Construction Project
    • General Conditions
      • Receive notice to proceed and sign contract
      • Submit bond and insurance documents
      • Prepare and submit project schedule
      • Prepare and submit schedule of values
      • Obtain building permits
      • Submit preliminary shop drawings
      • Submit monthly requests for payment
      • Site Grading and Utilities
        • Clear and grub site
        • Install underground utilities
        • Install temporary power service
        • Install exterior fire line and building fire riser
        • Erect building batter boards and layout building
    • Foundations
      • Excavate foundations
      • Excavate elevator pit
      • Form column piers and spread foundations
      • Rough-in electric and plumbing in elevator
      • Form elevator pit walls
      • Pour column piers, foundations and walls
      • Cure
      • Strip forms
      • Install pneumatic tube in elevator pit
      • Prepare and pour concrete floor in elevator pit
      • Steel erection
        • Erect steel columns, beams and joist - 1st and 2nd floors
        • Erect steel columns, beams and joist - 3rd floor and roof
        • Install miscellaneous iron and bracing - 1st and 2nd floors
        • Install miscellaneous iron and bracing - 3rd floor and roof
        • Install stairs and miscellaneous iron railing
        • Touch-up paint on steel
    • Form and Pour Concrete - Floors and Roof
      • Install rebar and in-floor utilities (including mechanical, electrical, plumbing)
      • Pour separate floors
      • Cure separate floors
      • Strip forms
      • Form roof slab including all floor openings
      • Install electrical underground
      • Install plumbing underground
      • Install rebar and in-floor utilities
    • Masonry Work
      • Rough-in plumbing at toilets and masonry walls
      • Lay masonry at core, mechanical, and toilets
      • Install exterior masonry work
      • Install roof drains
      • Install tile in toilet rooms
      • Roofing
        • Install flashing at parapet walls
        • Pour lightweight concrete roof fill
        • Install seamless roofing material
        • Spread stone ballast on seamless roof
        • Set rooftop equipment
    • Building Finishes
      • Install millwork and wood trim
      • Paint walls and woodwork
      • Install conduit at ceiling plenum space
      • Install duct in ceiling plenum space
      • Install ceiling grid
      • Install ceiling tile
      • Hang wallpaper
      • Install building carpet
      • Install hardware and accessories
      • Complete interior and exterior sod and plantings
      • Pave, curb, and stripe parking lot
    • Plumbing
      • Rough-in plumbing in drywall walls
      • Tie-in fire line riser and set valves
      • Set plumbing fixtures and trim
      • Flush, test, and clean piping and fixtures
    • Electrical
      • Rough-in electrical in masonry walls
      • Rough-in electrical in drywall walls
      • Pull wire in conduit and set area transformers
      • Install and terminate electrical devices
      • Make electrical terminations for HVAC equipment
        • Heating and Ventilating - AC
        • Set equipment in mechanical room
        • Rough-in mechanical in masonry walls
        • Rough-in mechanical in drywall walls
        • Install duct in building chase
      • Install light fixtures - test and clean
    • Complete Final Inspections
      • Complete elevator inspection and certification
      • Perform architect's inspection
      • Perform local building agency inspection
      • Perform Fire Marshal's inspection
      • Final Clean-up and Occupancy
        • Install hard tile flooring in common areas
        • Clean hard tile floors
        • Remove debris from building and do final clean-up
        • Substantial completion date
      • Complete punch list items from all inspections