Engineering Project Plan - Gantt Chart

- Engineering project plan
- Conceptual
- Planning and Control
- Business plan identifying project opportunity
- Define project objective and information needs
- Identify industry standards for project objectives
- Develop preliminary conceptual schedule and staffing
- Initial planning complete
- Develop appropriation strategy
- Develop management model and staff plan
- Site Assessment
- Identify potential sites
- Define infrastructure requirements
- Define utility needs
- Identify project site
- Assess regulatory and environmental impacts
- Identify permitting requirements
- Recommend site
- Site and planning review
- Scope Definition
- Develop general scope for project objectives
- Evaluate project needs, develop major study list
- Start major studies
- Complete major studies and make recommendations
- Develop specific scope
- Prepare final conceptual schedule
- Provide written scope information
- Discipline Support
- Create deliverables list
- Start flow sheets and design criteria
- Start discipline-specific drawings and equipment list
- Start conceptual layout
- Complete flow sheets and design criteria
- Complete discipline-specific drawings and equipment list
- Complete conceptual layout
- Conceptual Phase Completion
- Prepare conceptual scope and estimate for review
- Evaluate business plan - rework as needed
- Conceptual phase complete
- Definition
- Planning and Control
- Review conceptual plan
- Update project staffing plan
- Develop project contingency and indirect cost factors
- Identify definition phase engineering deliverables
- Scope Definition
- Review studies list
- Provide design requirements
- Establish vendor data requirements/equipment budgets
- Define equipment specifications and list
- Generate piping and instrument drawing (PID)
- Discipline Support
- Review regulatory agency requirements
- Generate general arrangement and site plans
- Develop discipline specific control drawings, lists, specifications
- Evaluate input on feasibility of construction input
- Definition Phase Completion
- Generate scope document (including infrastructure)
- Generate project capital estimate
- Establish project schedule
- Review definition, scope and estimate
- Scope complete/issue cost estimate
- Appropriate project monies
- Project authorized
- Design
- Planning and Control
- Review definition, scope and estimate
- Develop or update project procedures
- Finalize design and construction schedule
- Develop and manage issues list
- Procure long delivery equipment
- Establish and implement procurement and contracting plan
- Plan and staff design phase
- Define engineering presentation and content for specifications and drawings
- Implement document control
- Establish project monitoring
- Develop project cost control and earned value system
- Finalize deliverables list
- Implement project reporting
- Invoice approval/contract payments
- Procure equipment
- Implement expediting including vendor drawings
- Training start-up plan
- Scope Refinement
- Update project design criteria
- Issue for design: equipment list
- Issue for discipline design: piping and instrument drawings (PIDs)
- Issue for discipline design: general arrangement drawings (GAs)/site plan
- Equipment specification, bid, vendor selection
- Process equipment functional descriptions
- Discipline Support
- Establish discipline governing code requirements
- Review and finalize discipline standards and specifications
- Start Discipline Design
- Start architectural design
- Start civil design
- Start mechanical design
- Start piping design
- Start structural design
- Start electrical design
- Start instrumentation design
- Implement first quality review
- Vendor drawing review (all disciplines)
- Vendor drawing certification (all disciplines)
- Cross discipline engineering review
- Complete equipment list
- Complete PIDs
- Complete GAs/site plan
- Complete Discipline Design
- Complete architectural design
- Complete civil design
- Complete mechanical design
- Complete structural design
- Complete piping design
- Complete electrical design
- Complete instrumentation design
- Implement second quality review
- Implement code compliance and safety reviews
- Design Phase Completion
- Check and redraft drawings and lists (all disciplines)
- Produce permit drawings and code compliance calculations (all disciplines)
- Issue engineering for permitting, bidding and construction
- Contractor selection/contract review
- Project complete - close out report, issue drawings of record
- Construction
- Select construction contractor
- Mobilize on site
- Construction
- Construction complete