Waste, Water & Treatment Plan - WBS

- Waste, Water & Treatment Plan
- SCR & EQUALIZATION BASIN
- MOBILIZATION
- EQUIPMENT SET-UP
- WALK WAYS
- EXCAVATE & BACKFILL
- ENTRANCE
- STRIP TOPSOIL
- EXCAVATE & FILL
- FORM & POUR SLAB
- FORM & POUR WALLS
- FORM & POUR WALKS
- BACKFILL
- ELECTRICAL
- PAINT & FINISHES
- PUMP STATION
- SET PRECAST STATION
- BACKFILL
- SET PUMPS & VAULT
- PIPING
- ELECTRICAL
- CONTROL BUILDING
- FILL
- EXCAVATE & POUR FOOTINGS
- MASONRY TO FLOOR LEVEL
- PIPE & ELECTRIC UNDER SLAB
- FORM & POUR SLAB
- MASONRY & OPENINGS
- ROOF FRAMING
- PLUMBING
- HVAC & ELECTRICAL
- FINISHES
- FILL SITE
- GENERAL CONSTRUCTION
- CONCRETE
- SET EQUIPMENT
- PIPING
- ELECTRICAL
- ROADS
- FENCE
- FINISH GRADE & SEED
- STARTUP & TEST
- PROJECT SUBSTANTIAL COMPLETION
- ENGINEER & CONTROL
- STRIP TOPSOIL
- SCR & EQUALIZATION BASIN
- EXCAVATE & FILL